Contracting Agency Original Request For
Prevailing Wage Rate
Form Options
CLICK ON EACH QUESTION TO SHOW THE ANSWER. CLICK ON THE QUESTION
AGAIN TO HIDE THE ANSWER. |
|
- 1.
You are a contractor
or subcontractor looking for prevailing wage rates to bid on a
project.-
- Is the
total cost of the project under $100,000 and contain federal stimulus
money?
If yes, please go to the Wage
Determinations OnLine.gov web site, located at
http://davisbacon.fedworld.gov
- Is the total cost of the project over $100,000?
If yes, the state prevailing wage rate schedule is issued project specific
ONLY to the Contracting Agency or Agent who is advertising the project for
bid. These initial Rate Schedules are not posted and cannot be downloaded
from the Department of Labor web site. Rate Schedules MUST be included in
the Bid Documents/Bid Specifications at the time the project is advertised
for Bid, and not provided later through an addendum. Please contact the
Contracting Agency or their Agent to obtain the Rate Schedule. If the
Contracting Agency does not provide the Rate Schedule, please call (860)
263-6542 to question if the project is covered under the state prevailing
wage requirements.
- 2.
You are the
Contracting Agency or their Agent who has received federal
stimulus money and the total cost of the project is under
$100,000.-
State prevailing wage rates do not
apply, and you need to obtain a federal wage determination.
Please go to the Wage Determinations OnLine.gov web site, located at
http://davisbacon.fedworld.gov
.
-
3.
You are the Contracting Agency or their Agent and the total cost
of the project exceeds $100,000. |
|
|
|
|
|