Connecticut Department of Labor, Partner of the American Job Center Network
  Home About Us FAQ News and Notices Contact Us
Unemployment Benefits On-Line Job Seekers Employers Labor Market Information Directions/Office Information

 

Prevailing Wage Rate Schedule Requests
September, 2013

Schedule Type  
Building Heavy Residential Service Town Project Number Date Issued Project Requested By
TRUE FALSE FALSE FALSE Norwalk 3344 9/27/2013 Lighting Fixture Retrofit And Interior Lighting Fixtures For The City Hall City Of Norwalk
FALSE TRUE FALSE FALSE Waterbury C159 9/27/2013 Bradley Avenue And Oronoke Road Sidewalk Reconstruction City Of Waterbury
TRUE FALSE FALSE FALSE Clinton JH1240 9/27/2013 A New Gazebo For The Town Beach JH Architects
FALSE FALSE TRUE FALSE Fairfield 2014-18 9/27/2013 Install Fire Alarm And Call For Aid Monitoring System For The Parish Court Retirement Village Town Of Fairfield
TRUE FALSE FALSE FALSE Norwich   9/27/2013 East Great Plains Fire Department Generator Replacement CLA Engineers
TRUE FALSE FALSE FALSE Hartford 2013B-44 9/27/2013 Dewatered Cake Storage Bin Improvements At Hartford MDC CH2M Hill
TRUE FALSE FALSE FALSE Wolcott   9/27/2013 Boiler Replacement At Wolcott High School Town Of Wolcott
TRUE FALSE FALSE FALSE Norwalk 3352 9/27/2013 ADA Accessibility Improvements At Lockwood Mathews Mansion Museum City Of Norwalk
FALSE TRUE FALSE FALSE Meriden   9/27/2013 Reconstruction Of Gravel Street And Baldwin Avenue DOT
TRUE FALSE FALSE FALSE Milford   9/27/2013 East Shore Middle School Furniture, Fixtures And Equipment Silver Petrucelli
TRUE FALSE FALSE FALSE Middletown   9/27/2013 Cottage Sprinkler Systems At The Albert J Solnit Children's Center Dept. Of Children And Families
FALSE FALSE FALSE TRUE Statewide 13PSX0177 9/27/2013 Rental Of Trucks With Operators For DOT Staff Augmentation DAS
FALSE TRUE FALSE FALSE Greenwich   9/27/2013 Rehabilitation Of Route Fifteen Over Riversville Road Bridge Number 05653 DOT
TRUE FALSE FALSE FALSE Hartford   9/27/2013 50-55 Farmington Avenue Repair And Renovations Morganti Group Inc.
TRUE FALSE FALSE FALSE New Haven   9/27/2013 Southern Connecticut State University Library Phase III Skanska
FALSE TRUE FALSE FALSE Groton   9/27/2013 Mystic Streetscape Phase II Town Of Groton
FALSE TRUE FALSE FALSE Wallingford 12-057 9/27/2013 Reconstruction Of Concrete Sidewalks And Incidental Work At Various Locations Town Of Wallingford
FALSE TRUE FALSE FALSE Meriden B014-17 9/27/2013 Construction Of Sidewalks, Curbs And Ramps On Myrtle Street, Hobart Street, Akron Street And Crescent Street City Of Meriden
FALSE TRUE FALSE FALSE Meriden B014-14 9/27/2013 Harbor Brook Flood Control Site Remediation And Improvements City Of Meriden
FALSE TRUE FALSE FALSE East Hampton   9/26/2013 Brewer Road Pavement Rehabilitation Anchor Engineering
FALSE TRUE FALSE FALSE Canton   9/26/2013 Crack Sealing Of Various Roadways Town Of Canton
FALSE TRUE FALSE FALSE Rocky Hill 2009-96A 9/24/2013 Sanitary Sewer Improvements: Various Sewers/Manholes - II CDM Smith
FALSE TRUE FALSE FALSE Glastonbury 2013B-10 9/24/2013 Water Main Replacement For Neipsic Woods MDC
FALSE TRUE FALSE FALSE Wethersfield 2009-96A 9/24/2013 Sanitary Sewer Improvements: Various Sewers/Manholes - II CDM Smith
FALSE TRUE FALSE FALSE Branford   9/20/2013 Final Closure And Post Closure Improvements For Branford Landfill Fuss & O'Neil
FALSE TRUE FALSE FALSE Watertown   9/18/2013 Vets Park Parking Lot Improvements Town Of Watertown
FALSE TRUE FALSE FALSE Greenwich   9/18/2013 Multi Space Parking Stations Town Of Greenwich
TRUE FALSE FALSE FALSE Glastonbury GL-2014-11 9/18/2013 Roof Replacement At 1944 Main Street And 2380 New London Turnpike Town Of Glastonbury
TRUE FALSE FALSE FALSE New Haven SCSU-2013-02 9/18/2013 Pelz Gym Exercise Science Department Interior Renovations At Southern Connecticut State University SCSU
FALSE TRUE FALSE FALSE New Haven   9/18/2013 Construct Wildlife Hazard Deterrent Fence At Tweed New Haven Airport Hoyle, Tanner & Associates
TRUE FALSE FALSE FALSE New Haven   9/18/2013 Remove And Replace Roof Top Units At New Haven Corrections Center DOC
FALSE FALSE FALSE FALSE Greenwich 7009-R 9/18/2013 Multi Space Parking Station Town Of Greenwich
FALSE TRUE FALSE FALSE Meriden   9/18/2013 Hot In Place Asphalt Recycling On Research Parkway City Of Meriden
FALSE TRUE FALSE FALSE Norwich 103-262 9/18/2013 Pavement Rehabilitation Of Wisconsin Avenue City Of Norwich
FALSE TRUE FALSE FALSE Fairfield 2014-16 9/18/2013 Southport Center Restorations Town Of Fairfield
FALSE TRUE FALSE FALSE Fairfield 2014-07 9/18/2013 Sanitary Sewer Pipe Replacement At The Intersection Of Mason And Pierce Streets Town Of Fairfield
FALSE TRUE FALSE FALSE Stamford   9/18/2013 Synthetic Turf Replacement At Westhill High School Main Field City Of Stamford
FALSE TRUE FALSE FALSE New Haven   9/18/2013 Major Sidewalk Repair City Of New Haven
FALSE TRUE FALSE FALSE Groton   9/18/2013 Gravity Thickener Improvements Water Pollution Control Facility Town Of Groton
TRUE FALSE FALSE FALSE Canton   9/18/2013 Aquatic Facility Renovations At Mills Pond Pool TLB Architecture
FALSE TRUE FALSE FALSE New Haven   9/18/2013 Forbes Avenue Driveway Access At 115 Peat Meadow Road City Of New Haven
FALSE TRUE FALSE FALSE Hartford 2013B-11 9/17/2013 Storm And Sanitary Rehabilitation And Water Main Replacement On Huyshope Avenue Wright Pierce
FALSE TRUE FALSE FALSE Hartford   9/17/2013 Construct Traffic Signal On Main Street City Of Hartford
TRUE FALSE FALSE FALSE Mansfield 901781 9/17/2013 Core Campus Deferred Maintenance At Uconn Uconn
TRUE FALSE FALSE FALSE Farmington 11-042 9/17/2013 Ambulatory Care Center Construction Manager Interior Fit Out At Uconn Health Center Uconn HealthCenter
FALSE TRUE FALSE FALSE East Windsor   9/17/2013 Replacement Of Buried Steam Pipe At Albert J Solnit Children's Center North Campus DCF
TRUE FALSE FALSE FALSE Mansfield 901775 9/17/2013 Sidewalk Improvements South Campus At Uconn Uconn
FALSE TRUE FALSE FALSE Windsor   9/16/2013 Reconstruction Of Prospect Hill Road DOT
TRUE FALSE FALSE FALSE Bridgeport 02-1314 9/16/2013 Railing Modifications At The Juvenile Detention Center Judicial Branch
FALSE TRUE FALSE FALSE Stafford   9/16/2013 Highland Terrace Sidewalk Project WSE Inc.
TRUE FALSE FALSE FALSE Prospect 216-0026N 9/16/2013 Construction Of A New Elementary School Turner Construction
FALSE TRUE FALSE FALSE Hartford DPW12-34 9/16/2013 Streetscape Improvements For The Coltsville Corridor Phase I City Of Hartford
FALSE TRUE FALSE FALSE Woodbridge   9/16/2013 Intersection Improvements Route Sixty Three At Route Sixty Seven DOT
FALSE TRUE FALSE FALSE Oxford   9/16/2013 Reconstruction Of Christian Street From Towner Lane To Robinson Lane DOT
FALSE TRUE FALSE FALSE New Haven   9/16/2013 I95 New Haven Harbor Crossing Corridor Improvements Contaminated Soil Management DOT
TRUE FALSE FALSE FALSE Southington   9/16/2013 Fire House Engine Company Three Roof Replacement Town Of Southington
TRUE FALSE FALSE TRUE Hartford JCLM14REG0004 9/16/2013 Elevator, Escalator, Travelator And Handicapped Lifts Maintenance And Repair Services For The State Capitol Facilities And Old State House Connecticut General Assembly
FALSE TRUE FALSE FALSE Norwalk   9/16/2013 Rehabilitation Of Bridge Number 04046 Burnell Boulevard Over Norwalk River DOT
TRUE FALSE FALSE FALSE Bridgeport   9/16/2013 Replace Roof Top Units At Bridgeport Corrections Center Department Of Correction
FALSE TRUE FALSE FALSE Salem   9/13/2013 Route Eleven Expressway Extension Nobis Engineering
TRUE FALSE FALSE FALSE Meriden   9/13/2013 Asbestos Removal At Seventy Seven State Street City Of Meriden
TRUE FALSE FALSE FALSE Hartford 2012-01 9/13/2013 Dry Ash Handling For The Hartford Water Pollution Control Facility Black & Veatch
FALSE TRUE FALSE FALSE Preston   9/13/2013 Culvert Rehabilitation On Connecticut Route 2 DOT
FALSE TRUE FALSE FALSE Montville   9/13/2013 Route Eleven Expressway Extension Nobis Engineering
FALSE TRUE FALSE FALSE Waterford   9/13/2013 Route Eleven Expressway Extension Nobis Engineering
FALSE TRUE FALSE FALSE East Lyme   9/13/2013 Route Eleven Expressway Extension Nobis Engineering
FALSE TRUE FALSE FALSE Middlefield WR-DR-8201-2013-01 9/13/2013 Beseck Lake Dam Repairs And Maintenance WM Schultz
FALSE TRUE FALSE FALSE Griswold   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Killingly   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Plainfield   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Putnam   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Thompson   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Waterford   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Montville   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Norwich   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Lisbon   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Plainfield   9/13/2013 Replacement Of Highway Signing On I395 DOT
FALSE TRUE FALSE FALSE Colchester   9/13/2013 Culvert Rehabilitation On Connecticut Route 2 DOT
TRUE FALSE FALSE FALSE Mansfield 13-003 9/13/2013 Telecommunications Cabling Project At Storrs Center Medical Group Uconn Health Center
FALSE TRUE FALSE FALSE Milford   9/13/2013 Replacement Of Bridge Number 00330 US Route One Over Wepawaug River DOT
FALSE TRUE FALSE FALSE Norwich 103-262 9/12/2013 Pavement Rehabilitation Of Wisconsin Avenue City Of Norwich
FALSE TRUE FALSE FALSE Windsor   9/12/2013 Maple Avenue, Spring Street And Court Street Sidewalk Replacement Town Of Windsor
FALSE TRUE FALSE FALSE Seymour   9/12/2013 Town Of Seymour Sidewalks 2013 Nafis & Young Engineer
TRUE FALSE FALSE FALSE Waterbury   9/9/2013 Waterbury Train Station Improvements Phase I Building Demolition Waterbury Development Corporation
TRUE FALSE FALSE FALSE Ansonia   9/4/2013 Ansonia Police Station HVAC Upgrades BL Companies
FALSE TRUE FALSE FALSE Shelton   9/4/2013 Housatonic Riverwalk Phase II City Of Shelton
FALSE TRUE FALSE FALSE Middlefield WR-DR-8201-2013-01 9/4/2013 Dam Repairs And Maintenance At Beseck Lake Dam Fuss & O'Neill
TRUE FALSE FALSE FALSE Meriden Q014-05 9/4/2013 Evansville Avenue Pump Station Roof Replacement City Of Meriden
FALSE TRUE FALSE FALSE Farmington 13-603.01 9/4/2013 Sidewalk Repairs At The Uconn Health Center Uconn Health Center
FALSE TRUE FALSE FALSE Plainville   9/4/2013 Plainville WPCF Primary Clarifier Sludge Collector Replacement CDM Smith
FALSE TRUE FALSE FALSE Statewide   9/4/2013 Liquid Bituminous Material DOT
FALSE TRUE FALSE FALSE Norwalk RD2013-3 9/4/2013 Landmark Square Streetscape Improvements On East Wall Street City Of Norwalk
TRUE FALSE FALSE FALSE Avon   9/4/2013 Technology At Reggio School Of The Arts CREC
TRUE FALSE FALSE FALSE Groton   9/4/2013 Installation Of HVAC Former Colonel Ledyard School Building City Of Groton
TRUE FALSE FALSE FALSE Farmington 11-042 9/4/2013 Ambulatory Care Center Fit Out At Uconn Health Center Dimeo Construction

return to 2013 Prevailing Wage Rate Schedules Issued
 


200 Folly Brook Boulevard, Wethersfield, CT 06109 / Phone: 860-263-6000

Home | 
CT.gov Home Send Feedback
State of Connecticut Disclaimer and Privacy Policy. Copyright 2002 - present year