Connecticut Department of Labor, Partner of the American Job Center Network
  Home About Us FAQ News and Notices Contact Us
Unemployment Benefits On-Line Job Seekers Employers Labor Market Information Directions/Office Information

 

Prevailing Wage Rate Schedule Requests
February, 2013

Schedule Type  
Building Heavy Residential Service Town Project Number Date Issued Project Requested By
FALSE TRUE FALSE FALSE Greenwich   2/1/2013 Pavement Preservation DOT
TRUE FALSE FALSE FALSE New Haven BI-JD-301 2/1/2013 Upgrade Elevator Mechanical Systems For The New Haven Superior Courthouse DAS
TRUE FALSE FALSE FALSE Windsor Locks BI-Q-657 2/1/2013 New Entry Control Point At Camp Hartell DAS
TRUE FALSE FALSE FALSE New Britain   2/1/2013 CREC Medical Professions And Teacher Preparation Magnet School Fusco
TRUE FALSE FALSE FALSE Stamford   2/1/2013 HVAC Replacement At Kweskin Theater City Of Stamford
TRUE FALSE FALSE FALSE Stamford   2/1/2013 Oil Tank Removal And Replacement At Newfield And Roxbury Elementary Schools City Of Stamford
FALSE TRUE FALSE FALSE Wolcott   2/1/2013 Replacement Of Bridge Number 03075 SR 322 Over Lindsley Brook DOT
FALSE TRUE FALSE FALSE Wallingford   2/1/2013 Water Main Insulation And Hanger Replacement Over East Center Street And Harrison Road Bridge Town Of Wallingford
TRUE FALSE FALSE FALSE Wallingford   2/1/2013 Alarm And Intercom Upgrades For All Schools For The Board Of Education Town Of Wallingfod
FALSE TRUE FALSE FALSE Shelton   2/1/2013 Canal Street Infrastructure Improvements Decarlo and Doll
FALSE TRUE FALSE FALSE Greenwich 6951 2/5/2013 Pavement Markings Town Of Greenwich
FALSE TRUE FALSE FALSE East Hartford   2/13/2013 2013 Roadway Improvements VHB
FALSE TRUE FALSE FALSE Statewide   2/13/2013 Epoxy Resin Pavement Marking Installation On Routes I91 And I95 DOT
FALSE TRUE FALSE FALSE Norwich   2/13/2013 Pavement Preservation On I395 DOT
TRUE FALSE FALSE FALSE Norwalk 3267 2/13/2013 Renovation And Adaptive Reuse Of The Bunkhouse At Cranbury Park City Of Norwalk
TRUE FALSE FALSE FALSE Statewide LM020113-1 2/13/2013 Fire Alarm System Alteration Services At Uconn Campuses Uconn
TRUE FALSE FALSE FALSE Statewide LM020413-1 2/13/2013 Sprinkler System Alteration Services At Uconn Campuses Uconn
FALSE TRUE FALSE FALSE Danbury   2/13/2013 Paving In Place City Of Danbury
FALSE TRUE FALSE FALSE East Windsor   2/13/2013 Prospect Hill Drive And Cricket Road Roadway And Drainage Improvements, Phase III L. Wagner & Associates
FALSE TRUE FALSE FALSE Wallingford   2/13/2013 Wallingford Housing Authority Ulbrich Heights Basement Drainage L. Wagner & Associates
FALSE TRUE FALSE FALSE New Haven   2/13/2013 Intersection Improvements On Route Ten At Lamberton Street DOT
FALSE TRUE FALSE FALSE Southington   2/13/2013 Rehabilitation Of Bridges 01235 And 01236 I84 EB And WB Over Marion Avenue DOT
FALSE TRUE FALSE FALSE Hartford   2/13/2013 I95 Pavement Preservation DOT
FALSE TRUE FALSE FALSE Statewide   2/13/2013 Epoxy Pavement Marking Non Interstate Routes DOT
FALSE TRUE FALSE FALSE Montville   2/13/2013 Pavement Preservation On I395 DOT
TRUE TRUE FALSE FALSE Bridgeport   2/13/2013 Building Construction And Upland Site Improvements For Hillard Bloom Shellfish Company TPA Design
TRUE FALSE FALSE FALSE Norwalk 3284 2/13/2013 Furniture, Fixtures And Equipment At The New Fire Station Facility City Of Norwalk
FALSE FALSE FALSE TRUE Waterbury   2/14/2013 Property Management Services At 7 Kendrick Avenue, 300 Grand Street And 400 Grand Street Judicial Branch
FALSE TRUE FALSE FALSE New Britain 3718 2/14/2013 Crack Sealing On Various City Streets City Of New Britain
FALSE TRUE FALSE FALSE Manchester 02-1228 2/14/2013 Parking Lot Repairs At 410 Center Street Judicial Branch
FALSE FALSE FALSE TRUE New Britain   2/14/2013 Property Management Services At Twenty Franklin Square Judicial Branch
TRUE FALSE FALSE FALSE Greenwich   2/15/2013 Greenwich High School Music And Instructional Space And Auditorium Turners Construction
FALSE TRUE FALSE FALSE Meriden B013-26 2/15/2013 Rehabilitation Of Sanitary Sewers City Of Meriden
TRUE FALSE FALSE FALSE Stamford   2/15/2013 Davenport Ridge Elementary School Window And Door Replacement Silver Petrucelli & Associates
TRUE FALSE FALSE FALSE Sterling   2/15/2013 Senior Center Renovations L. Wagner & Associates
FALSE FALSE TRUE FALSE Stonington 137-SC-11-PHM 2/15/2013 Stonington Housing Authority Installation Of Doors L. Wagner & Associates
FALSE TRUE FALSE FALSE Waterbury 151-0276N 2/15/2013 Waterbury Career Academy High School Playground Equipment  
TRUE FALSE FALSE FALSE Bridgeport   2/15/2013 Eisenhower Center Roof Replacement City Of Bridgeport
FALSE TRUE FALSE FALSE Statewide   2/15/2013 Epoxy Resin Pavement Marking Installations On Interstate Routes DOT
FALSE TRUE FALSE FALSE Farmington   2/15/2013 Pavement Preservation On CT Route 4 DOT
TRUE FALSE FALSE FALSE Stratford   2/15/2013 Locker Replacement At Flood Middle School Geddis Architects
FALSE FALSE FALSE TRUE Rocky Hill 13PSX0019 2/15/2013 Custodial Services For The Chief States Attorney Office DAS
FALSE TRUE FALSE FALSE East Haddam   2/15/2013 Replacement Of Bridge Number 02501 And 02502 Route 82 Over Succor Brook DOT
FALSE TRUE FALSE FALSE Fairfield 2013-52 2/15/2013 Repairs To Stone Revetment At Pequot Avenue Bridge Town Of Fairfield
FALSE TRUE FALSE FALSE Fairfield 2013-46 2/15/2013 Dredging, Transportation And Redistribution Of Spoils At South Benson Channel Town Of Fairfield
TRUE FALSE FALSE FALSE North Haven 25-01-0266 2/15/2013 Reconstruction And Renovations Of Four North Haven Fire Houses Downes Construction
FALSE TRUE FALSE FALSE Greenwich   2/15/2013 Holly Hill Transfer Station Sewer Replacement CDM Smith
TRUE TRUE FALSE FALSE Ledyard 2013-03 2/15/2013 Construction Of Booster Pumping Station To Serve Aljen Heights Water Extension, Phase 1B Armory Engineers
TRUE TRUE FALSE FALSE Shelton   2/15/2013 Shelton Wastewater Treatment Plant Aeration Improvement Fuss & O'Neill
FALSE TRUE FALSE FALSE New Milford   2/15/2013 Long Mountain Road Drainage Improvements Town Of New Milford
FALSE TRUE FALSE FALSE Shelton   2/15/2013 Canal Street Infrastructure Improvements Decarlo And Doll
TRUE FALSE FALSE FALSE Meriden 080-0092 RNV/E 2/15/2013 Additions And Alterations To Francis T Maloney High School Gilbane Building Company
TRUE FALSE FALSE FALSE Guilford   2/15/2013 EC Adams Middle School Ventilation, Air Conditioning And Ceiling Replacement Silver Petrucelli
TRUE FALSE FALSE FALSE Rocky Hill 12PSX0388 2/15/2013 Standby Generator For The Office Of Chief States Attorney DAS
TRUE FALSE FALSE FALSE Newtown   2/15/2013 New Ambulance Facility Silver Petrucelli
FALSE TRUE FALSE FALSE Griswold   2/15/2013 Main Street Lighting Stadia Engineering
TRUE FALSE FALSE FALSE Newtown 13-22 2/20/2013 Energy Conservation Measures At Garner CI DOC
TRUE FALSE FALSE FALSE Mansfield 201413 2/21/2013 North West Quad Code Renovations At Uconn Uconn
FALSE TRUE FALSE FALSE Norwalk PM 2013-1 2/21/2013 Pavement Management Program City Of Norwalk
TRUE FALSE FALSE FALSE Mansfield 201614 2/21/2013 South Campus Envelope Repairs At Uconn Uconn
FALSE TRUE FALSE FALSE Groton 2536-07 2/21/2013 Rehabilitation Of Thames Street Milone And Macbroom
FALSE TRUE FALSE FALSE Stamford CP-2045 2/21/2013 Carriage Drive Area Sewers Stamford Water Pollution Control Authority
FALSE TRUE FALSE FALSE Glastonbury GL-2013-13 2/21/2013 Main Street Pavement Rehabilitation Town Of Glastonbury
FALSE TRUE FALSE FALSE Canton   2/21/2013 Canton High School Track, Field And Parking Lot Improvements Milone And Macbroom
TRUE FALSE FALSE FALSE Cheshire 1213-05 2/21/2013 Roof Replacement For The Public Works Garage BL Companies
TRUE FALSE FALSE FALSE Woodbury   2/21/2013 Woodbury Natural Gas Conversion BL Companies
FALSE TRUE FALSE FALSE West Hartford   2/21/2013 Roadway Based Preparation For Various Roads Town Of West Hartford
FALSE TRUE FALSE FALSE Glastonbury GL-2013-23 2/21/2013 Main Street Traffic Signal Improvements Town Of Glastonbury
TRUE FALSE FALSE FALSE Windham 163-0071 MAG/N 2/21/2013 Windham STEM Magnet School Installation Of Furniture Fixtures And Equipment ARCADIS-US
TRUE FALSE FALSE FALSE Waterbury   2/21/2013 Water Pollution Control Sanitary Collection System SCADA, Phase III City Of Waterbury
FALSE TRUE FALSE FALSE Norwalk WM2013-03 2/21/2013 Replacement Of Water Mains Colonial Place First District Water Department
TRUE FALSE FALSE FALSE New Britain 11054.02 2/21/2013 Walnut Hill Park Band Shell Stage Renovations Kaestle Boos Associates
FALSE TRUE FALSE FALSE New London   2/21/2013 Renovations At Calkins Park City Of New London
FALSE TRUE FALSE FALSE Madison   2/21/2013 East And West Wharf Repairs Town Of Madison
FALSE TRUE FALSE FALSE West Hartford   2/21/2013 2.5 Million Gallon North Water Storage Tank MDC
FALSE TRUE FALSE FALSE Fairfield 2013-58 2/21/2013 Repairs To Jetties And Groins Town Of Fairfield
TRUE FALSE FALSE FALSE Stamford 135-0270EC 2/21/2013 Window And Door Replacement At Davenport Elementary School City Of Stamford
FALSE FALSE FALSE TRUE Statewide 12PSX0395 2/21/2013 Phragmites Herbicing And Mowing DAS
FALSE TRUE FALSE FALSE Wolcott 13-25-1 2/25/2013 Road Resurfacing 111A Town Of Wolcott
FALSE TRUE FALSE FALSE Rocky Hill 2009-96 2/25/2013 Pipe And Manhole Rehabilitation CDM Smith
FALSE TRUE FALSE FALSE Wethersfield   2/25/2013 Mill Woods Beach Maintenance Town Of Wethersfield
TRUE FALSE FALSE FALSE Middletown   2/25/2013 Bus Maintenance And Storage Facility Decarlo And Doll
TRUE TRUE FALSE FALSE New Haven 8902-A 2/25/2013 New Haven Line Signal System For Metro North Railroad Metro North Railroad
FALSE TRUE FALSE FALSE Stonington   2/25/2013 Stonington High School Synthetic Turf Field Milone And Macbroom
FALSE TRUE FALSE FALSE Hartford   2/25/2013 Phase II MSW Area Closure And Photovoltaic System CRRA
TRUE FALSE FALSE FALSE New Haven   2/25/2013 Work Station Improvements For The South Central Connecticut Regional Water Authority South Central Conn. Regional Water Authority
FALSE TRUE FALSE FALSE Wethersfield 2009-96 2/25/2013 Pipe And Manhole Rehabilitation CDM Smith
FALSE TRUE FALSE FALSE Hartford   2/25/2013 Paving At Mark Twain School Arcadis/O&G Industries
FALSE TRUE FALSE FALSE Old Lyme   2/25/2013 Rogers Lake Dam Repairs And Fish Ladder Nathan L. Jacobson
FALSE TRUE FALSE FALSE Marlborough   2/27/2013 Replacement Of South Main Street Culvert Nathan L. Jacobson Architects
FALSE FALSE TRUE FALSE Griswold   2/28/2013 General Improvements And Renovations At Ashland Manor Senior Housing L. Wagner
FALSE TRUE FALSE FALSE New Haven   2/28/2013 Criscuolo Park Shoreline Repairs City Of New Haven
FALSE TRUE FALSE FALSE Montville 2010-0102 2/28/2013 East Lyme New London Interconnection Project Contract Two Water Storage Tank Tighe & Bond
TRUE FALSE FALSE FALSE East Hartford   2/28/2013 Rentschler Field Energy Conservation Measures Office Of Policy And Management
TRUE FALSE FALSE FALSE North Branford   2/28/2013 Alum System Improvements At The Lake Gaillard Water Treatment Plant Tighe & Bond
TRUE TRUE FALSE FALSE East Lyme 2010-0102 2/28/2013 East Lyme New London Interconnection Project Contract Number One Water Transmission Main Tighe & Bond
TRUE TRUE FALSE FALSE Montville 2010-0102 2/28/2013 East Lyme New London Interconnection Project Contract Number One Water Transmission Main Tighe & Bond
TRUE TRUE FALSE FALSE Waterford 2010-0102 2/28/2013 East Lyme New London Interconnection Project Contract Number One Water Transmission Main Tighe & Bond
TRUE FALSE FALSE FALSE Middletown 2013-001 2/28/2013 Cleaning And Painting Of Process Piping And Appurtenances At The Roth Water Treatment Plant W/S City Of Middletown
FALSE TRUE FALSE FALSE Manchester 2013 2/28/2013 Sidewalk Spot Repair Program Town Of Manchester
FALSE TRUE FALSE FALSE West Hartford 2013 2/28/2013 Storm Drainage Installation And Repair Town Of West Hartford
TRUE FALSE FALSE FALSE Bridgeport   2/28/2013 HVAC RTU Units Replacement And Related Renovations At Burroughs and Saden Public Library City Of Bridgeport
FALSE TRUE FALSE FALSE Shelton   2/28/2013 Rehabilitation Of Bridge Number 03222 Route 110 Over Morgan Curtiss Brook DOT
FALSE TRUE FALSE FALSE Stamford   2/28/2013 Rosa Hartman Park Renovations City Of Stamford
FALSE TRUE FALSE FALSE Bethlehem 2013-02 2/28/2013 Sanford Lane Roadway Resurfacing  
TRUE TRUE FALSE FALSE Waterford 2010-0102 2/28/2013 East Lyme New London Interconnection Project Contract Three Water Pump Stations Tighe & Bond
TRUE TRUE FALSE FALSE Montville 2010-0102 2/28/2013 East Lyme New London Interconnection Project Contract Three Water Pump Stations Tighe & Bond
TRUE TRUE FALSE FALSE East Lyme 2010-0102 2/28/2013 East Lyme New London Interconnection Project Contract Three Water Pump Stations Tighe & Bond
TRUE FALSE FALSE FALSE Mansfield 901213 2/28/2013 Mansfield Training School Improvements At Merritt Hall At Uconn Uconn
FALSE TRUE FALSE FALSE Bethlehem 2013-01 2/28/2013 Munger Lane Roadway Resurfacing  
FALSE TRUE FALSE FALSE Windsor 2013-04 2/28/2013 Maple Avenue Sewer Replacement And Rehabilitation AI Engineers
TRUE FALSE FALSE FALSE Stamford   2/28/2013 Dolan Middle School Exhaust Fan Repairs And Replacements City Of Stamford
FALSE TRUE FALSE FALSE Norwalk ER2013-06 2/28/2013 Water Distribution Emergency Repairs And Non Emergency Improvements At Various Locations First District Water Department
FALSE TRUE FALSE FALSE Plainfield   2/28/2013 Rehabilitation Of Bridge Number 00303 Moosup Pond Road Over I395 DOT
TRUE FALSE FALSE FALSE New Haven TMP-289-BQQP 2/28/2013 Demolition And New Construction To Amistad High School Fusco
TRUE FALSE FALSE FALSE Middletown BI-YS-170 2/28/2013 Additions And Renovations To Campus Connecticut Juvenile Training School DAS
FALSE TRUE FALSE FALSE Groton   2/28/2013 Thames Street Sewer Pipe Rehabilitation City Of Groton
FALSE FALSE TRUE FALSE Middletown   2/28/2013 Marino Manor Kitchen Cabinet And Floor Replacement J Associates Architects

return to 2013 Prevailing Wage Rate Schedules Issued
 


200 Folly Brook Boulevard, Wethersfield, CT 06109 / Phone: 860-263-6000

Home | 
CT.gov Home Send Feedback
State of Connecticut Disclaimer and Privacy Policy. Copyright 2002 - present year